ADVISOR: Ibrahim Miskioglu (imiski@mtu.edu)
PRESIDENT: Ed Knoch (heknoch@mtu.edu)
VICE PRESIDENT: Dominic Perry (daperry@mtu.edu)


Wake Team
Snow Team
Park Team


About Us
Members
Mission/Goals
Background
Join Us


Photos
Events

Google

Team Leader: Brendon O'Connell (bmoconne@mtu.edu)
Meetings: Tuesday at 5:30 PM in the MUB Commons

---------------------------------------------------------------

The BST Park Team at Michigan Technological University is responsible for creating new and innovative terrain park features that are lightweight, easy to set up and move, and provide the necessary strength and weather resistance inherent to a terrain park environment. Initially, the Park Team has constructed park features for Houghton’s Mont Ripley, but the team would like to expand to provide features for other ski areas as well. The Park Team focuses on keeping obstacles smooth and safe while utilizing engineering principles to minimize weight and maximize strength.

For a much more detailed description of the BST Park Team, click here.

--------------------------------------------------------------------------------------------------------------------------

Projects for 2007-2008

  • 30’ Down-Flat-Down box constructed using an I-beam design
  • 24’ plywood-cladded Launch Rail

Past Projects:

  • Built 30' box pictured above for Mt Ripley. This box was one of the most commented on features of Ripley's entire terrain park
  • Built 15' flat-down steel rail for Mt Ripley
  • Rebuilt 15' flat rail. You may remember this rail as the re-rod legged rail

---------------------------------------------------------------------------------------------------------------------------------------

Copyright ©2008 BoardSport Technologies Enterprise
This page was last updated: April 28, 2008