            ATDC (Fall/Spring 2004)

                Summary

The current Advanced Technology Development Center will be in need of expansion in the next 10-15 years.

                Goal

Design additional space for the ATDC in the for of an addition for the existing facility, an additional storage facility, and a site plan for a proposed industrial park.

                ATDC Report (Coming Soon!)

            Wastewater Management (Spring 2004)

                Summary

 

                Goal

Design a wastewater treatment system, choosing from three main design options: Package Plants, Drain Fields, and Lagoons.

                Ellsworth Wastewater Treatment System Report (PDF)

            MTU Heating System (Spring 2004)

                Summary

MTU Facilities has been running into trouble with the current heating control system on MTU's main campus.

                Goal

Analyze the current heating control system as well as researching and analyzing open protocol and web-based control systems.  Perform an analysis and present a recommendation to MTU Facilities Management.

                MTU Heating System Report (Coming Soon!)